![Scope1 Scope1](https://www.binaxinjing.com/wp-content/uploads/2018/06/Scope1.png)
Scope of works
- Duration of project: (2024 - Present)
- Type of jacking method: Manshield Excavation Method
![aim1 aim1](https://www.binaxinjing.com/wp-content/uploads/2018/06/aim1.png)
Aim of the project
- To establish a new and effective power plant transmission pipeline.
- To connect pipelines for waste water by using Manshield Excavation Method.